Boston Building

Location
Greenock
Client
Holland House Property Investment
Duration
36 Weeks
Architect
Bradford Robertson

The building was stripped to a shell condition. The project then involved extending the steel frame to build an additional floor of office accommodation. DDA compliant ramped access, lift installation and disabled toilets were added. A feature stair was fitted and the internal fit out completed.

The external façade of the building features stainless steel and black cladding with an insulated render system to the rear with a new single ply roofing membrane.   A generator base was installed and the overlaying of the existing tarmac car park completed.

Scope
Construction
Sector
Industrial