Lainshaw Early Learning Centre

Location
Stewarton
Client
East Ayrshire Council
Duration
20 weeks
Architect
East Ayrshire Council

The works entailed forming a new extension to the lower end of the school (South East Elevation) to encompass a new Early Learning Centre which will be accessed via the current building by a link corridor. The extension is a single storey timber kit erected on a brick, block and concrete solumn and a mixture of curtain walling, metal panel walls, brick plinths and Sarnafil Roof.

There was a full fit out of the extension covering dry lining, floating floors, new windows, new doors, suspended ceilings, soft floor coverings and full M&E works.

The external phase of the works encompassed hard and soft landscaping to form children’s play area with resin bound play top, artificial grass and planters.

Scope
Construction
Sector
Education
Environment
Live Environment