The High School of Glasgow

Location
Glasgow
Client
The High School of Glasgow
Duration
15 months
Architect
Wylie Shanks

The works comprised of alterations and a two storey upward extension of the existing science wing. A steel frame was erected which spans over the science department. Floors were constructed of concrete on metal decking.

The building envelope was constructed in facing brick, mock slate tiles were laid to the roof and aluminum powder coated windows were installed.

Scope
Construction, Fit Out, Refurbishment
Sector
Education
Environment
Live Environment