Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-cerber domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/akpscotland/public_html/wp-includes/functions.php on line 6114
310 St Vincent Street - AKP
Contract Value:
0-£500k
Timescale:
12 weeks
Size:
5,000 sq.ft.
Location:
Glasgow
Sector:
Commercial

akp has carried out numerous office fit out project in St Vincent Street in Glasgow City Centre and were delighted to have been awarded this high specification project.

The plans outlined a scheme to sub-divide the office suite to split Level 1 into two separate office suites.

A partition wall from floor slab to ceiling slab was installed to form a new entrance area.

The fit out works to the East Suite comprised:

  • Existing fire alarm system to remain and be adapted to suit new layout.
  • Installation of new partition systems and new single glazed door sets to form new meeting rooms layout.
  • Associated M&E works including AV installation works (video conferencing), fan coil units.
  • New lighting design to replace existing lighting.
  • Downtaking / strip out works.

Test text test text

Community Benefits
Initiatives including local SME supply chain opportunities and a Foodbank Collection for Glasgow SW Foodbank were carried out on site.
Added Value
The project was registered with the Considerate Constructors Scheme and was targeted to achieve simply Compliant but the team at akp like to aim high and we were delighted to have achieved Performance Beyond Compliance.