Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-cerber domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/akpscotland/public_html/wp-includes/functions.php on line 6114
Spire Global (SP5) - AKP
Contract Value:
0-£500k
Timescale:
12 weeks
Location:
Glasgow
Sector:
Commercial

The works for this project demanded a full internal strip out of the previous tenant’s fixtures and fittings followed by at CAT B fit out.

akp built a breakout zone, kitchen café and a number of meeting rooms. This included glass screens, partitions, bespoke reception desk and lighting and window boards and cills.

Full mechanical and electrical work was installed which compiled of ventilation, air conditioning, lighting, small power and data and comms.

Design Team
Whitecross Building Consultancy Limited