The scope of the works included stripping and removing all existing secondary steelwork from the site and re-instating new steel works,
re-cladding of roof walls to existing structure and construction of new steel framed extension to front elevation.
M&E works were carried out including a fire & intruder detection system and a CCTV system.
akp carried out civil works providing alterations to entrance road and retaining walls.